The Cross House was built in 1894. It is located at 526 Union Street, in Emporia, Kansas. I purchased the house in March 2014.

Want to learn about the background of the house?

 

Want to help?


widget

My blog posts about the restoration are below.

 

The Cross House, Emporia, designed by architect Charles M. Squires.

The Cross House, Emporia, designed by architect Charles W. Squires.

Currently displaying blog entries in Chronological Order. Switch to Most Recent.

Currently displaying blog entries in Most Recent Order. Switch to Chronological Order.

An Annunciator Announcement!!!!!!!!

           

Continue Reading 

CH: Day 44

           

Continue Reading 

CH: Day 43

     

Continue Reading 

CH: Day 42

     

Continue Reading 

CH: Day 41

   

Continue Reading 

CH: Day 40

 

Continue Reading 

CH: Day 39

      The drip cap cannot be installed after the siding is installed.    

Continue Reading 

Prepare to be…GOBSMACKED!

In 2018, Blair and his wife, Beth, toured the Cross House. During the visit Blair made a major discovery. To appreciate today’s post you might wish to first read the 2018 post. And this dramatic Part II post. I will have some wine while you read. . . . . . . . . ….

Continue Reading 

CH: Day 38

Drum roll, please. Yesterday I posited two questions. Was there a circa-1920 header above the entry of the Carriage House, under the turret? Or was the turret supported by a full-width 1894 header? Today…I have an answer from the past.           This will make removing the entry and replacing it with…

Continue Reading 

A Bo Find

     

Continue Reading 

CH: Day 37

          …I have an idea. Above the door is exposed sheathing. The door is later to be replaced by the large window from the living room. The window will be centered under the turret. This will necessitate a new header. Rather than do this from the interior, as I had planned…

Continue Reading 

CH: Day 36

   

Continue Reading 

CH: Day 35

               

Continue Reading 

CH: Day 34

             

Continue Reading 

Twins!!!!!!!!

Remember the south hall in the Cross House that I was working on last fall? After a lot of work I shifted focus to doing the library, and the hall, while much better than it was a year ago, remains unfinished. Due to an AC trunk line I installed in 2014, the ceiling had to…

Continue Reading 

CH: Day 33

    It rained most of the afternoon. Some drizzle. Some downpour. All the while I painted away under the blue tarp and a piece of plywood (far right) I tacked in place as a temp roof. I enjoyed the surreal quality the afternoon. All the while listening to Barack Obama. The downspout will soon…

Continue Reading 

CH: Day 32

     

Continue Reading 

CH: Day 31

     

Continue Reading 

CH: Day 30

     

Continue Reading 

CH: Day 29

     

Continue Reading